May 19, 2024

Cleaning accessories decoration contract model

Owner (hereinafter referred to as Party A): Telephone:

Construction Team (hereinafter referred to as Party B): Telephone:
Party A and Party B signed the following contracts in an equal and fair manner in accordance with the "Contract Law" and other related laws in a friendly and cooperative manner.
Second, the price cleansing package fee: ¥ 5,200, capitalized: Wu Xiyuan whole plumber yuan yuan woodworking yuan painter yuan yuan yuan yuan Qingyuan freight, payment method 1, construction team approach, advance living expenses: 1000 yuan 2. Carpentry is completed, pay 1000 yuan 3, bricklayer is completed, pay 1000 yuan 4, the project is completed, pay 1800 yuan 5, the warranty of 400 yuan, payment from the date of completion 1 year after the payment, design 1, Party A if any drawings A set of drawings shall be provided to Party B and shall be responsible for the submission of work.
2. If Party A does not have drawings, Party B shall submit clear requirements to Party B, and Party B shall draw a draft for approval by Party A before construction.
V. Materials 1. Party B shall provide Party A with a list of required materials for purchase within 3 days in advance. Party A shall promptly purchase materials for the construction team within 4 days. Both parties shall bear their own responsibility for delaying the construction period and economic losses.
2. Without the consent of Party A, Party B may not purchase materials by itself. If it has been purchased, Party A has the right to refuse to use it and may refuse to pay for the material.
3. Party B shall purchase materials at the building materials supply point designated by Party A and issue official invoices.
4. Party B shall accept and accept the quality of the building materials purchased by Party A. It is found that quality problems should be promptly raised to Party A and have the right to refuse to use it. If Party A insists on using it, Party B shall request Party B in writing and bear the loss caused by the quality of the material.
5. Party B shall help Party A to receive the goods and check the accuracy of the quantity and accessories.
6. Party B shall do a good job of custody of materials, and it is forbidden for people to enter the site.
7. Party B shall ensure that there is no double bag and half bag in the area.
8. Party B shall do a good job in the protection of finished products for construction.
9. Without the permission of Party A, Party B shall not carry any building materials to go out. If such phenomena are found, the price of materials shall be doubled from the labor cost.


6. The construction period starts from the date of the year to the date of the year and month, and the construction period is days. Because of delays by the Party A, the construction period is postponed. Because Party B delays the construction period, Party A can deduct the labor cost of Party B by 50 yuan/day. The materials shall be sent downstairs to the location where the project is located. Any construction personnel of Party B shall carry it unconditionally.
VIII. Garbage removal and transportation 1. Garbage bagging 2. Garbage should be cleaned daily 3. Garbage should be removed by Party B to the garbage dump site specified by the property. 9. Workforce management 1. Party B should provide all construction personnel to Party A before starting work. A copy of the ID card.
2. Without the permission of Party A, non-site construction personnel may not stay overnight on the construction site.
3. Party A shall promptly handle the community access documents for Party B and pay related fees.
4. Party B shall have all the documents for temporary stay in Shanghai. The related losses caused by incomplete documents shall be borne by Party B itself.
5. Party B designates the person in charge of the site as the replacement person in charge.
6. Within the contract price, Party B shall provide follow-up Party A's selection materials.
7. Party B shall not arbitrarily change the construction personnel without the consent of Party A. Every day, the site must maintain more than 2 (1) persons of construction personnel.
8. Without the consent of Party A, Party B shall not suspend or complete the work under any circumstances.
X. Construction Tools 1. Party B shall bring its own tools required for construction and ensure the safety and good use of the tools. Party B shall bear the cost of tool maintenance.
2. The consumables (such as drills, saws, etc.) generated by the tool shall be borne by half of Party A and Party B respectively, and Party A shall purchase the goods, and settle after the completion of the project.
XI Site Management 1. Site use of open flames is prohibited.
2. Smoking is prohibited on site.
3. Paint materials must be placed separately from other materials.
XII. Maintenance 1. Due to the quality problems caused by Party B's construction, Party B shall repair it without payment within two years.
2. Ordinary maintenance Party B shall promptly repair within three days after Party A informs Party B. In special circumstances (water and electricity problems), Party B must arrive and repair within 24 hours.
3. If Party B fails to complete maintenance in time according to the contract, Party A can arrange for other construction teams to perform maintenance work. The labor costs incurred are deducted from the warranty.


XIII. Contract Annex 1. List of construction projects.
2. Both parties agree on the quotation.
3. List of materials purchased by Party B.
XIV. Contract Disputes 1. There was dispute between Party A and Party B before negotiation.
2. Negotiations may not be filed in the disputed court.
Fifteen, decoration requirements A. Decoration process "Circuit installation process requirements:
1. When the circuit is installed, the product material must have a certificate of conformity.
2, three-wire installation must use three different color standard. In principle, red, yellow, blue, and FireWire colors. Blue, green, and white are line markers, and black and yellow-green lines are ground color markers.
3. When all the conductors are installed, they must be pierced with corresponding pvc pipes and buried in the previously chiseled groove with a depth of 4 × 3 cm. If the side-by-side line groove is widened, it must not affect the construction of other types of work. If necessary, Negotiating with wood and bricklayers to solve the problems in construction, there must be no work style that cares only for themselves and does not care about the overall situation.
4. All lines must be distributed in a horizontal and vertical direction. Spider web distribution is strictly prohibited. The pvc pipe should be about 3cm into the main switch box, and then be distributed along the wall, along the ground, with a 90-degree elbow or hose connection at the corner and fixed with a pipe clamp. All wires cannot have connectors in pvc tubes.
5. The wire diameter of the embedded wire is calculated according to the power of the electric appliance. The air conditioner, the Yuba, the electric water heater and the refrigerator must be put in place from the switch box.
6. The length of all embedded wire left at the junction box is 20cm, and the wire box must be firmly sealed with cement mortar and keep it upright.
Must not be skewed, the joint is slightly lower than the wall about 0.5cm. The total switch box size can be determined by how much the customer uses the wire.
7. After all the wires are in place and confirmed, the power test can be performed by connecting all the power connectors to the lamp cap and putting on the 15w light bulb. If the power supply is turned on, it indicates that the circuit installation is basically qualified. At this time, the project can be filled. single. Please sign and accept the other types of work, and the electrical concealment project will be completed.
8, install a variety of lamps and switch panels, need to paint before the relocation of the three days or the last time the oil comes into play, the top of the large chandelier must be fixed in advance with a 4 × 3cm expansion Luosi wooden, and then the chandelier fixed Rose Cut on the wood side. The panel installation of all switches must be flat and must not be skewed. When the ceiling lamp is installed, the fixed rose must be cut on the wooden rake. It is forbidden to cut it on the gusset plate (this rasper can be installed by the carpenter in advance).
9, telephone lines and cable television lines must not be the same with the wire in a pvc pipe must be their own way. ”


"Waterway process installation requirements:
1. The used 6-point water pipe or aluminum-plastic composite pipe must be a qualified product that has passed inspection and delivery.
2. During the construction process, all the tubing connecting joints must be wrapped with hemp and white paint and tightened. They should be placed horizontally and vertically. In case of crossover of the ground pipelines, the secondary ducts Bridges must be installed below the main pipe to keep the overall pipe distribution on a horizontal line.
3. The water pipes that pass through the balcony must be buried in the 4cm deep groove on the ground or wall surface of the original rough house, and then the cement shall be used to seal the groove.
4. After the pipe is in place, you must use the pipe clamp to grip the pipe at the turning point or where there is a stop or stop. Do not loosen the pipe.
5, all the places where the water must be installed under the water pipe and floor drain, the pvc pipe of the pipe must be connected with a special pvc glue coating evenly. And note that when the horizontal drop is connected to the main sewer pipe embedded in the original blank house, it should remain stationary for 6 hours.
6. If the main sewer pipe embedded in the original blank room is not enough or not ideal (not in position), the sewer pipe can be re-opened in the floor according to the actual situation, and the pipe with fireproof rubber can be used to seal the pipe. The newly sealed area is surrounded by a mortar with a height of 10mm. After the solidification is completed for 58 hours, the circle is filled with water. After 24 hours, it is infiltrated downstairs to see if there is any water seepage around the newly installed water pipe. For example, if it is not proved that the new pipeline is qualified, on the contrary, the pipeline must be reprocessed, and then the seepage test should be conducted until it is qualified. ”


Brush the wall 1 Before brushing the wall, scrape off some of the water and putty on the wall and the ceiling, do the patching 2 over the 108 times, glue it twice, put the primer over again, paint the ceiling twice, and pay attention to the amount of water required for the latex paint. Every brush paint needs to be checked by the head of the household.
Package door cover 1. Demolition of the original door frame, large core board substrate, beech wood veneer, beech wood solid wood door line. Door line width is not more than 55mm, thickness is not more than 10mm.
2. Paint: Polyester varnish 3 times.
3 The wall and door covers should be wrapped with a bandage or kraft paper, and the acceptance criteria for dumb mouths should be horizontal and vertical, ±1mm within 2m, and the exposed part chamfer 1×45° per workpiece. All yin and yang angles must be Check the verticality of the door by placing a square on the door hanger. 2. Laminate press, edge banding, flat panel shape (door size not more than 1000mm)

Three trees paint paint paint switch cement door price

High Transparency Laminated Smart Film

YuGugang have produced standard Intelligent Smart Film for lamination for nearly 8 years. Switchalbe Film used for produced of Laminated Switchable Smart Glass.

PDLC Switchable Smart Film for lamination is available in widths up to 2150mm with a maximum sheet length of 9000mm, which can be cut to any size or shape.

Intelligent Glass already supplies several of the world's largest glass laminators. If your company is looking to produce your own Intelligent Glass, please contact us for more information about becoming an OEM Partner.

A simple ON-OFF Smart Privacy Glass from being clear (transparent) to frosted (opaque). Smart Film its laminated with EVA Film with a standard autoclave.


High Transparency Laminated Smart Film,Laminated Smart Film,Intelligent Film,Smart Film In Building Glass

Shenzhen YuGuang New Material Co.,Ltd , https://www.ygsmartfilm.com