April 28, 2024

Construction of water supply and drainage pipes and sanitary ware

1. The installation of pipelines should also be horizontal and vertical, and the pipelines should be unobstructed. The installation position of various valves is reasonable, and it is convenient for future maintenance and replacement.

2, if do the dark pipe, after completion of the first water, pressure, check all joints, valves and connection points whether there is water seepage, water leakage, check the error before sewing.

3, sanitary ware need to be installed after the end of the ceiling (if you need to ceiling), bathtubs, toilets, water tanks, basins and other water supply and drainage pipe installation should be reasonable, water, pressure and carefully check whether there is leakage, such as In case of sloppyness, once a water leak occurs (generally directly affecting neighbors downstairs), the consequences can be disastrous (equivalent to renovating once).

4, other appliances such as: mirror box, paper cylinder, soap tank, cup rack, towel bar, shower curtain rod, bath handle must be firmly installed (preferably with expansion bolts), no loose phenomenon, location and height, coating It is clean, non-destructive, and non-polluting. In addition, the faucet's cover must be close to the wall, and no gaps can be left.

Bathtub aisle ceiling faucet

Polycrystalline Solar Panel

Solar Home System,Solar Energy System,Solar Power System

Mono Solar Panel ,Monocrystalline Solar Panel Co., Ltd. , http://www.chsolarpanels.com