April 24, 2024

Abrasives enterprise environmental protection rectification reference manual

Abstract Since the environmental supervision, the abrasives and abrasives enterprises have been suffering from the problem of rectification. The following is a reference manual for rectification of enterprises in a certain place, which can be used for reference. (This manual is only for the reference of enterprise rectification, and is not used as the specific basis for the EIA.) The basic hardship required for enterprises to conduct EIA in 2017...
Since the environmental supervision, the abrasives and abrasives enterprises have been suffering from the problem of rectification. The following is a reference manual for the rectification of enterprises in a certain place, for your reference. (This manual is for reference only for corporate rectification and is not a specific basis for handling EIA.)
The basic hard requirements for enterprises to apply for environmental impact assessment in 2017 1. Determine the nature of the land. No project can be established except for construction land. 2. The enterprise is a registered company and must be a general taxpayer.
3. Confirm whether the protection distance (residential area) of the enterprise reaches 50 meters (the protection distance of forging and punching is 100 meters)
4. A hazardous waste transfer contract must be signed with a company that specializes in hazardous waste.

EIA processing procedures 1. The EIA agency shall pre-investigate the enterprise site to determine whether the enterprise has the conditions for handling the EIA.
2. Confirm the nature of the land of the enterprise, and the construction land can be used for the environmental impact assessment.
3. The Development and Reform Bureau will establish a feasibility study report by a third-party consulting company. After obtaining the feasibility study report, it will go to the Linqing Municipal Development and Reform Bureau for approval and register online for project approval. (See attachment 1)
4. After the project is completed, the assets will be assessed by the provincial and above qualified accountants, and the price can be negotiated by themselves.
5. After the asset evaluation is completed, go to the Law Enforcement Brigade of the Municipal Environmental Protection Bureau to handle the transcript of the unapproved first construction and the third simultaneous inquiry, issue the enterprise formalities, official seal, project report, asset evaluation report, and corporate identity card, report to the Environmental Protection Bureau, and declare After the penalty notice is issued, the unpaid first construction and three simultaneous fines will be paid. The fines are now rated at no less than 60,000 (unapproved companies). (See Appendix 2 for the specific process)
6. After paying the fine, the environmental assessment department of the Environmental Protection Bureau will file a record, and the third party will make an environmental assessment report. According to the guidance of the environmental impact assessment report, the environmental protection equipment will be used.
7. At the same time, find a third-party testing company, conduct trial operation on the equipment, issue a test report, and the cost can be negotiated by itself. If the environmental protection equipment is qualified, test the operation report to the Municipal Environmental Protection Bureau, and wait for acceptance by the Environmental Protection Bureau.
Remarks: Before the EIA procedure, the rectification and EIA procedures should be carried out simultaneously with reference to the standards in the reference manual.

attachment1
The preparation of the feasibility study report requires the entrusting unit to provide the information.
1. Project name: ×× company annual output × × tons × × product project.
II. Introduction of the unit: XX Company is located in XX Village, Panzhuang Town, Linqing City, Shandong Province. It is a professional manufacturer of XX, engaged in the production, processing, wholesale and retail of bearings and accessories. The products are widely used in XX.
Corporate profile: name, ID number, contact number.
Third, the plan map (example map)
4. Land information: land occupation × × mu, price.
V. Equipment list: equipment name, model number × × power × × quantity × × amount.
Sixth, buildings: buildings (shops, warehouses, office buildings, dormitories, restaurant rooms, solid waste workshops, etc.) × × structure (steel structure plus brick masonry, brick structure, brick, brick, steel structure) × × Area × × layer height × × number of layers.
Seven, the main product × × product model × × annual output × × unit price × × product implementation standards.
Eight, annual consumption cost breakdown (raw materials, auxiliary materials, etc., unit price) energy consumption varieties (water, electric coal, etc.) and quantity:
Example: silicon carbide - × × tons / year; corundum - × × tons / year; embryo cloth - × × square meters / year; abrasive belt - × × square meters / year; accessories - × × barrel / year; electricity - × × 10,000 degrees / year; water - × × cubic meters / year...
Nine, product production process and advanced:
Example: Fabric treatment - back squeegee - front squeegee - unwinding - bottom sizing machine - winding - flex.
X. Labor quota; organization; working hours.
XI. Project Contact: Telephone:
Twelve, construction period:
Thirteen, fund raising methods: loans - × × yuan, self-raising - × × yuan.

Annex 2
Process for EIA
I. Environment of the factory 1. The pavement is hardened in the plant area. There is no oil and no debris in the ground and wall surface of the factory. Especially, some solid waste such as oil drums and iron surface must enter the solid waste. Miscellaneous items such as old equipment, packing boxes, and waste products are not allowed to exist and need to be stored together (clean and tidy).
2. Construction of hazardous wastes Requirements:
(1) Set up a separate dedicated room with doors and windows, no other debris, fire protection facilities (such as fire sand, fire hydrants).
(2) Install a cold light.
(3) The ground is hardened, clean and tidy.
(4) The double-lock double management system outside the door and the dangerous goods identification plate.
(5) Indoor wall solid waste management system and solid waste production process flow chart and solid waste account.
Second, the workshop environment 1, the construction of the environment inside the workshop Requirements:
(1) The floor is free of oil and clean, and it is installed with leak-proof layer or hardened (the ground hardening is generally cement floor and anti-leakage coating, and the leakage-proof layer is added under the cement floor under conditions).
(2) There is no oil on the surrounding walls. If it is not up to standard, it needs to be repainted.
(3) The production area, installation area, semi-finished product area and finished product area should be clearly defined.
2, machine tools (1) machine surface without oil, dust.
(2) The machine adds trays and pedals.

Musk Ambrette, Musk Ketone and Musk Xylene have a long history of use as fragrance ingredients, although musk ambrette is no longer used in fragrances. 

As part of the review of the safety of these uses, it is important to consider the systemic exposure that results from these uses. 

Offer Ambrette Musk,Musk Ambrette Synthesis,Musk Essential Oil From China Manufacturer


112

Ambrette Musk

Ambrette Musk,Musk Ambrette Synthesis,Musk Essential Oil,Musk Pod

Gan Su Original Flavor Co.,ltd , https://www.muskxylol.nl